Remington Row is a mixed use development located in Remington, a historic district in Baltimore Maryland. It consists of retail spaces, offices spaces, and multifamily dwellings, as well as underground and ground-level parking. The building was constructed as part of Seawall Development’s plan to revitalize this region of Baltimore. The building is 245,245 square feet and consists of two levels of underground parking, ground level parking, 13,500 SF of retail, 27,500 SF of office space, and 108 apartments occupying three floors.

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering.

About

this CPEP Website

CPEP Site Complete and Ready for Final Review

Final Presentation Uploaded

 

Final Report Uploaded

CPEP Updated

Proposal Posted

Notebook Submission C Posted

Building Statistics Part 2 Posted

5/6/2021

 

 

4/30/2021

 

 

4/30/2021

12/14/2020

12/11/2020

11/18/2020

8/26/2020

Notebook Submission B Posted

Notebook Submission A Posted​

Structural Existing Conditions  Report Posted

Projects Specs Obtained

Initiation Checklist Part 1 Turned In

Thank you email sent

Owner permission form received

Project drawings obtained

 

Owner approval received

10/30/2021

 

10/24/2020

10/5/2020

9/16/2020

8/24/2020

8/19/2020

8/19/2020

8/3/2020

8/3/2020

Note

While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Musaed Alhajeri. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.